Primafonte

Content date

The content date is the one a page declares in its structured data to say when it was published, with datePublished, and when it was last reviewed, with dateModified.

A model answering about something that changes prefers the source it can date. Without a declared date it cannot tell whether your page is still current, and when in doubt it cites the one it can place in time.

How the index measures it: Publication and revision date

Which date does the check look at?

Only the one declared in the JSON-LD of the inner content page. datePublished and dateModified are taken, and the most recent one counts. Dates written in the text are not read, because recognising them in seven languages and dozens of formats fails too often, and a check that gets it wrong subtracts more than it adds.

It passes with a date under 12 months old and half passes up to 36. It fails if the date is older or if there is none.

Why is the threshold so generous?

Because some content does not expire. A well-written guide can still be true 2 years later, and penalising it for not being touched would reward whoever changes a comma to move the date. 12 months separates what someone reviews from what nobody has looked at in years.

The middle band, up to 36 months, exists so that a page reviewed 2 years ago is not treated the same as one nobody has touched since it was published.

Can I use the date of the last deployment?

You can, but it is exactly what you should not do. A date that changes by itself on every deployment stops meaning anything: it says the site was published, not that anyone reviewed that text. dateModified is updated when the content truly changes, and not before.

Google asks this in its helpful content guide, among the signals of content made for search engines: whether the dates of pages are changed to make them look recent when the content has not changed substantially.

Where this comes from

Checked against the original source on 28 November 2026. When the source is a third party, we say so.

Frequently asked questions about Content date

What format is the date written in?

In ISO 8601, like 2026-11-28, or with time and time zone, like 2026-11-28T10:00:00+01:00.

Is the date visible on the article enough?

For the person reading, yes. For the check, no: it also has to be in the page's structured data.
Content date: datePublished and dateModified — Primafonte